更新bmad
This commit is contained in:
@@ -10,6 +10,16 @@ Phase 4 (Implementation) workflows manage the iterative sprint-based development
|
||||
|
||||
---
|
||||
|
||||
## Complete Workflow Context
|
||||
|
||||
Phase 4 is the final phase of the BMad Method workflow. To see how implementation fits into the complete methodology:
|
||||
|
||||

|
||||
|
||||
_Complete workflow showing Phases 1-4. Phase 4 (Implementation) is the rightmost column, showing the iterative epic and story cycles detailed below._
|
||||
|
||||
---
|
||||
|
||||
## Phase 4 Workflow Lifecycle
|
||||
|
||||
```mermaid
|
||||
@@ -162,7 +172,8 @@ Stories move through these states in the sprint status file:
|
||||
### Sprint 0 (Planning Phase)
|
||||
|
||||
- Complete Phases 1-3 (Analysis, Planning, Solutioning)
|
||||
- PRD/GDD + Architecture + Epics ready
|
||||
- PRD/GDD + Architecture complete
|
||||
- **V6: Epics+Stories created via create-epics-and-stories workflow (runs AFTER architecture)**
|
||||
|
||||
### Sprint 1+ (Implementation Phase)
|
||||
|
||||
@@ -235,8 +246,9 @@ tech-spec (PM)
|
||||
### Level 2-4 (BMad Method / Enterprise)
|
||||
|
||||
```
|
||||
PRD + Architecture (PM/Architect)
|
||||
→ solutioning-gate-check (Architect)
|
||||
PRD (PM) → Architecture (Architect)
|
||||
→ create-epics-and-stories (PM) ← V6: After architecture!
|
||||
→ implementation-readiness (Architect)
|
||||
→ sprint-planning (SM, once)
|
||||
→ [Per Epic]:
|
||||
epic-tech-context (SM)
|
||||
|
||||
Reference in New Issue
Block a user